Calgary, Alberta 2022
Calgary, Alberta 2022
BEACHAM - NOSE HILL PARK
When Dr Sydney N Bennett left a Beacham house in Calgary after renting space in between April 2019-August 2022 while renting a house out in the NE before selling
The NB-OT Labs forced Dr Sydney N Bennett to ditch items & after flying to Toronto to see Dr Mary Koslov before flying to Palm Springs with other plans the NB-OT Labs came up with other plans separate from with interests in the Government of Ontario forcing Dr Mary Koslov & Dr Sydney N Bennett to work around such efforts of those operating at or with the NB-OT Labs
Time line of events prior to 1999 & post leading up to 2025 with everything that occurred between April 2019 - August 2022
KOSLOV - BENNETT - PLANS
What Dr Mary Koslov & Dr Sydney N Bennett intended & planned
NB-OT LABS - PLANS
What those operating at or with the NB-OT Labs had intended & planned for Dr Mary Koslov & Dr Sydney N Bennett
KOSLOV - BENNETT
The efforts of those operating at & with the NB-OT Labs led to Dr Mary Koslov flying to Switzerland with family & extended then a CIG restructure with Dr Sydney N Bennett while the NB-OT Labs continued their wireless attacks on Dr Sydney N Bennett in Greater Toronto Area & later North Bay & area between 2022-2025 despite Dr Sydney N Bennett retaining a residence in Alberta, Canada
K.T is exposing those responsible for the Beacham attacks & prior Sylvan Lake + Red Deer then other efforts dating back to November 2012 separate from other efforts dating back before 1999 & post leading up to 2011-2012
- NB-OT Labs
Those operating at & with the NB-OT Labs
- Where Dr Sydney N Bennett was
Where Dr Sydney N Bennett was physically on a 24 hour basis & what Nic was doing & intending
TOUR BUS + OTHER POSITIONS
The NB-OT Labs even wanted Dr Sydney N Bennett to work at Riders Express & rent a room in Brampton then drive a route from Windsor to Ottawa - Montreal & return or Toronto to North Bay driving for Ontario Northland after having done so at Pursuit - Diversified & Golden Arrow in Alberta (Tour or Industrial + School Buses) despite the fact Dr Mary Koslov & Dr Sydney N Bennett had other plans
Statement:
Demands to just forgo ones life & plans so the NB-OT labs & corrupt areas of Government could robot control me to do different jobs including "Tour Bus driver" which I previously agreed to in Alberta for a term rather than had been forced to
At one point the dislogical NB-OT Labs expected me to just give away everything & keep a back pack then live in a Banff Depot room as their robot driver for Pursuit & disregard my home I owned & my investments or social life & children then all address of my life
I was to be their robot toy! Isolated & in address simple life for then to toy with 24/7 maybe keeping all read job like Tour Bus driver
Calgary - Sylvan Lake - Red Deer - Edmonton - Fort McMurray - Fort McKay
Canmore - Banff - Jasper
A tormented drive to Lethbridge & sabotaged Driving interview by NB-OT Labs which expected to expand Canada wide & internationally
EMPLOYERS
Companies in Alberta Dr Sydney N Bennett worked for 2012-2025
40-70 hour weeks 2012-2025 despite time outside the Province working for others due to the H.I.3 Case investigation through or connected to K.T & CIG
CIG
- Project Manager - Executive
Hyperactive Watersports
- Sales Associate then Retail Manager + Web-Editor
(Business Management in College or University required in this role)
Clean Harbors + Clients
- Decoking Pump Operator
(Physically fit like a Fire-Man to work in this role + Class 1 Commerical Drivers Licence then Energy Safety certifications)
Pursuit Collection Brewster Inc
- Level 4 of 4 Interpetive Guide & Driver
(Class 2 Commercial Drivers Licence & Guide training plus experience for this role)
Diversified Transportation + Clients
- Tour & Industrial Bus Driver
(Class 2 Commercial Drivers Licence & Guide training plus experience for this role)
Golden Arrow Transportation + Clients
- Tour & Industrial Bus Driver
(Class 2 Commercial Drivers Licence & Guide training plus experience for this role)
Energy Clients: Shell - Esso - ConnoPhillips-Nexus - Cenovous-Husky - Suncor - Syncrude - Jacos + Specifics
Separate or connected employers in British Columbia, Quebec & Ontario previous before 2012 Alberta then studies K-12 & College - University + Industry Spec
CANNOT COVER IT UP
If anyone attempts to cover up this case the Private - Non-Standardized Labs can then operate with international interests intiftwating the Public - Private Sector then Banking - Financial Institutions in Canada like other countries or areas
Privatized & Public Sector Standardized Labs exist with Defence Labs so Private - Non-Standardized Labs cannot operate or expand as had occurred between 2012-2025
Just when Suncor one of other affected Energy companies expects executives, investors or contract & regular employees are not wirelessly segregated. A competitor is wirelessly controlling, infiltrating & sabotaging with corrupt areas of Government & Banking
Worse than planted moles or double - triple + agents
SETTLEMENT PARTIALLY COVERED
Dr Sydney N Bennett had to forgo items which is addressed in the US $1.5 Trillion H.I.3 Scheme settlement for May 1, 2025 & US $30 Billion in rewards connected
All other affected persons cases have to be handled by other parties
CIG

Comments
Post a Comment